303-25 When will the timing start and stop when using hall flowmeter to measure the powder fluidity?
303-25 When will the timing start and stop when using hall flowmeter to measure the powder fluidity?
- When opening the hall flowmeter funnel hole, start timing.
- Stop timing as soon as the powder in the hall flow meter funnel runs out.
AS-300A Hall Flowmeter︱Flow Meter Funnel︱Metal Powder Flow Rate︱Apparent Density︱Carney︱Manufacturer